Skip to content

Commit 7f3fb30

Browse files
committed
update feedback dissemination
1 parent 05268b5 commit 7f3fb30

File tree

3 files changed

+8
-5
lines changed

3 files changed

+8
-5
lines changed

docs/07-feedback-dissemination/dissemination.md

+2-1
Original file line numberDiff line numberDiff line change
@@ -1,8 +1,9 @@
11

22
---
3-
sidebar_position: 1
3+
sidebar_position: 2
44
---
55

6+
67
## Documenting trials and publishing data
78

89
Open access publication of the data should be a goal of the trial. Tricot has already published a number of sizable datasets from on-farm trials (van Etten et al., 2018; Moyo et al., 2020; de Sousa et al., 2020). These datasets could become important for other research that repurposes these datasets (see section 11 below). Kool et al. (2020) have provided an incisive critique of on-farm testing in agronomy, especially the limited replicability of many trials as authors fail to report contextual factors (crop management) and sampling of locations and participating farmers. Similarly, a study on PVS in RTB crops reveals that on-farm trials are often documented in a very deficient way and that data are hardly published at all (Jose Valle et al., forthcoming). Data publication could become more attractive if it is easy to do and has rewards (citations of datasets repurposed by others). Publishing all data from trials could prevent the so-called file-drawer problem, which means that only certain datasets (for example, novel analyses, striking results) are published, which then lead to biased statistics in meta-analyses.

docs/07-feedback-dissemination/feedback.md

+5-4
Original file line numberDiff line numberDiff line change
@@ -2,7 +2,7 @@
22
sidebar_position: 1
33
---
44

5-
# Trial evaluation and feedback
5+
# Trial feedback and evaluation
66

77

88
## Feedback to farmers
@@ -36,13 +36,14 @@ This sheet available here was designed to present individual and group trial res
3636
The farmer diploma – an acknowledgement of the farmers’ contribution
3737
This diploma was designed to stress the importance of the farmers' contribution to the tricot trial. It is an acknowledgement of their role in the process. You can add the logo of your organization to the certificate. Print this for every farmer and sign.
3838

39-
![Farmer certificate](./img/farmer_certificate.png)
39+
![Farmer infosheet](./img/farmer_certifcate.png)
40+
4041
### How to prepare feedback sessions
4142
• Budget : Plan resources (team time and money) for this final workshop from the start. Plan your team’s time to visit all communities or regions holding trial result workshops. Plan for your team’s time to debrief after the workshops and document learnings to integrate them in the planning of next trials.
4243
• Group sizes: As with the training and distribution workshop, in most cases farmers should be limited to around 20-25 per event, in a central location accessible to all.
4344
• Materials – depends highly on implementation of the sheet & diploma. We recommend :
4445

45-
##Trial evaluation
46+
## Trial evaluation
4647

4748
The first tricot cycle has finished. What can be improved?
4849

@@ -54,7 +55,7 @@ After every project cycle, the project implementers, researchers, and local fiel
5455

5556
Also, with the results of every cycle, you may identify one or two technology options that were not well accepted by the farmers, or that did not work well in your region. For the next cycle, you can discard those technology options ranked lowest by farmers and replace them with new ones. This way, there is ‘refreshed’ input to the research system, and the farmers’ chances of discovering a suitable technology option for the conditions of their farm remain high.
5657

57-
###Indicators of success
58+
### Indicators of success
5859

5960
The success of your tricot trial can be measured. You can evaluate four indicators in ClimMob, which will give you an idea about the individual trials’ impact, and the project’s overall success.
6061

documentation.Rproj

+1
Original file line numberDiff line numberDiff line change
@@ -1,5 +1,6 @@
11
Version: 1.0
22
ProjectId: 9ee215df-1ad9-4814-aef7-ab9f1399c8e2
3+
34
RestoreWorkspace: Default
45
SaveWorkspace: Default
56
AlwaysSaveHistory: Default

0 commit comments

Comments
 (0)