Skip to content

💡 [REQUEST] - Intuitive aggregation of activities during activity model development #57

@ClimbingAl

Description

@ClimbingAl

Description

The Activity Editor currently supports Sub-tasks (an activity breakdown within a Top-level Activity, or the next highest level). This is a good feature but it can be hard to use. There are at least 2 aspects to this:

  1. It isn't clear that there are Sub-tasks for an activity visible in the UI.
  2. Being able to create an activity at a level and then promote / demote it to a different level is a natural thing to want to do when analysing and modelling a sequence of activities.

Basic Example

When modelling the sequence of activities on a production line, or on a construction site, quality inspection may be needed before proceeding to the next intended activity. If this Quality Inspection is added at the Top Level for a specific task it may later be more useful to group that with the activity that is subsequently inspected.

Drawbacks

Both points probably need to be addressed together.

Unresolved questions

Resolving aspects of how Time is handled is likely to impact this feature request.

Metadata

Metadata

Assignees

No one assigned

    Labels

    enhancementNew feature or request

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions