Skip to content

Milestones

List view

  • Dreams.

    No due date
  • Things that aren't required for immediately post-mvp, but can be worked on right afterwards

    No due date
  • These are things I would like to include in MVP, but I have to keep that scoped super tightly.

    No due date
    1/2 issues closed
  • The absolute bare requirements 1. train a NN and a RF 2. average their results together 3. make it useful for predicting kaggle results as an initial testpoint

    No due date