Update to Bevy 0.17 #391
ci.yml
on: push
all-doc-tests
7m 14s
lint
2m 33s
Matrix: test
Annotations
7 errors
|
lint
Process completed with exit code 101.
|
|
all-doc-tests
Process completed with exit code 101.
|
|
test (ubuntu-latest)
Process completed with exit code 101.
|
|
test (windows-latest)
The strategy configuration was canceled because "test.ubuntu-latest" failed
|
|
test (windows-latest)
The operation was canceled.
|
|
test (macos-latest)
The strategy configuration was canceled because "test.ubuntu-latest" failed
|
|
test (macos-latest)
The operation was canceled.
|