You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Copy file name to clipboardExpand all lines: Benchmarks/BuildingSimulation/README.md
+1-1Lines changed: 1 addition & 1 deletion
Original file line number
Diff line number
Diff line change
@@ -575,7 +575,7 @@ average forward and back (gradient) time: 0.00025673441800000017 seconds
575
575
576
576
---
577
577
#### Power Consumption
578
-
In order to measure the energy consumed during program execution we employed the use of a current shunt, a differential probe, and an oscilloscope.
578
+
We measured energy consumption during program execution using a current shunt, a differential probe, and an oscilloscope.
579
579
580
580
The current shunt resistor was placed in series with the positive input power terminal on the Orin. Both the voltage and current consumed were captured at high speed using 2 channels on an oscilloscope.
0 commit comments