You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
In the simulation workflow, why the transition model is called after location choice model? As location choice model is supposed to deal with both relocation part and transition part, should it be called after transition?
Thanks!
The text was updated successfully, but these errors were encountered:
Actually you're right - the transition model is most often called before the LCM. It's somewhat an empirical question though, as in reality these decisions are all being made throughout the course of the year.
Hi,
In the simulation workflow, why the transition model is called after location choice model? As location choice model is supposed to deal with both relocation part and transition part, should it be called after transition?
Thanks!
The text was updated successfully, but these errors were encountered: