Skip to content

Latest commit

 

History

History

most-profit-assigning-work

Folders and files

NameName
Last commit message
Last commit date

parent directory

..
 
 
 
 
 
 

< Previous                  Next >

You have n jobs and m workers. You are given three arrays: difficulty, profit, and worker where:

  • difficulty[i] and profit[i] are the difficulty and the profit of the ith job, and
  • worker[j] is the ability of jth worker (i.e., the jth worker can only complete a job with difficulty at most worker[j]).

Every worker can be assigned at most one job, but one job can be completed multiple times.

  • For example, if three workers attempt the same job that pays $1, then the total profit will be $3. If a worker cannot complete any job, their profit is $0.

Return the maximum profit we can achieve after assigning the workers to the jobs.

 

Example 1:

Input: difficulty = [2,4,6,8,10], profit = [10,20,30,40,50], worker = [4,5,6,7]
Output: 100
Explanation: Workers are assigned jobs of difficulty [4,4,6,6] and they get a profit of [20,20,30,30] separately.

Example 2:

Input: difficulty = [85,47,57], profit = [24,66,99], worker = [40,25,25]
Output: 0

 

Constraints:

  • n == difficulty.length
  • n == profit.length
  • m == worker.length
  • 1 <= n, m <= 104
  • 1 <= difficulty[i], profit[i], worker[i] <= 105

Related Topics

[Greedy] [Array] [Two Pointers] [Binary Search] [Sorting]