  • This milestone aims to capture the issues related to the development of new features that will be added in before the next major release. We can then also list all the polishing issues for ensuring parameters are properly defined, and if possible even testing procedures.

    Due by September 30, 2025
    13/32 issues closed
  • This are the list of issues that would be great to solve before a first release of the pipeline that could be shared with someone else if needed. The idea is to make it self-contained with the only requirements of VCFs and BAMs for each of the samples. Also think about the dependencies in terms of datasets that need to be built for specific tools and all these things.

    No due date
    26/34 issues closed