Skip to content

Tests

Tests #1004

Triggered via schedule December 1, 2025 01:18
Status Failure
Total duration 4m 0s
Artifacts

ci.yaml

on: schedule
Build charm  /  Collect platforms for charm | .
16s
Build charm / Collect platforms for charm | .
Lint  /  Lint .github/workflows/
5s
Lint / Lint .github/workflows/
Lint  /  tox run -e lint
18s
Lint / tox run -e lint
Check libraries
35s
Check libraries
Matrix: Build charm / build
Integration test charm  /  collect-integration-tests
Integration test charm / collect-integration-tests
Matrix: Integration test charm / integration-test
Waiting for pending jobs
Integration test charm  /  (beta) Publish Allure report
Integration test charm / (beta) Publish Allure report
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Build charm / Build charm | [email protected]:s390x
Process completed with exit code 1.
Build charm / Build charm | [email protected]:amd64
The strategy configuration was canceled because "build.build.ubuntu_22_04_s390x_self-h" failed
Build charm / Build charm | [email protected]:amd64
The operation was canceled.
Build charm / Build charm | [email protected]:arm64
The strategy configuration was canceled because "build.build.ubuntu_22_04_s390x_self-h" failed
Build charm / Build charm | [email protected]:arm64
The operation was canceled.