Skip to content

chore(deps): bump github.com/cosmos/gogoproto from 1.7.0 to 1.7.2 in /e2e #28573

chore(deps): bump github.com/cosmos/gogoproto from 1.7.0 to 1.7.2 in /e2e

chore(deps): bump github.com/cosmos/gogoproto from 1.7.0 to 1.7.2 in /e2e #28573

Triggered via pull request October 31, 2025 13:21
Status Failure
Total duration 5m 9s
Artifacts

test.yml

on: pull_request
Matrix: build
Matrix: unit-tests
Fit to window
Zoom out
Zoom in

Annotations

5 errors
unit-tests (08-wasm, ./modules/light-clients/08-wasm)
Process completed with exit code 1.
unit-tests (e2e, ./e2e, -tags="test_e2e")
The strategy configuration was canceled because "unit-tests._08-wasm___modules_light-" failed
unit-tests (e2e, ./e2e, -tags="test_e2e")
The operation was canceled.
unit-tests (ibc-go, .)
The strategy configuration was canceled because "unit-tests._08-wasm___modules_light-" failed
unit-tests (ibc-go, .)
The operation was canceled.