Skip to content

chore(deps): bump github.com/cosmos/gogoproto from 1.7.0 to 1.7.2 in /modules/light-clients/08-wasm #28574

chore(deps): bump github.com/cosmos/gogoproto from 1.7.0 to 1.7.2 in /modules/light-clients/08-wasm

chore(deps): bump github.com/cosmos/gogoproto from 1.7.0 to 1.7.2 in /modules/light-clients/08-wasm #28574

Status Cancelled
Total duration 1m 34s
Artifacts

test.yml

on: pull_request
Matrix: build
Matrix: unit-tests
Fit to window
Zoom out
Zoom in

Annotations

11 errors
unit-tests (e2e, ./e2e, -tags="test_e2e")
Canceling since a higher priority waiting request for Tests / Code Coverage-refs/pull/8698/merge exists
unit-tests (e2e, ./e2e, -tags="test_e2e")
The operation was canceled.
build (arm64)
Canceling since a higher priority waiting request for Tests / Code Coverage-refs/pull/8698/merge exists
build (arm64)
The operation was canceled.
unit-tests (ibc-go, .)
Canceling since a higher priority waiting request for Tests / Code Coverage-refs/pull/8698/merge exists
unit-tests (ibc-go, .)
The operation was canceled.
build (amd64)
Canceling since a higher priority waiting request for Tests / Code Coverage-refs/pull/8698/merge exists
build (amd64)
The operation was canceled.
unit-tests (08-wasm, ./modules/light-clients/08-wasm)
Canceling since a higher priority waiting request for Tests / Code Coverage-refs/pull/8698/merge exists
unit-tests (08-wasm, ./modules/light-clients/08-wasm)
The operation was canceled.
Tests / Code Coverage
Canceling since a higher priority waiting request for Tests / Code Coverage-refs/pull/8698/merge exists