chore(deps): update dependency publint to v0.3.16 #6760
node-ci.yml
on: push
Matrix: verify-matrix
verify
40s
release
/
release
Annotations
3 errors
|
verify-matrix (16.14.0)
Process completed with exit code 1.
|
|
verify-matrix (18.0.0)
The strategy configuration was canceled because "verify-matrix._16_14_0" failed
|
|
verify-matrix (18.0.0)
The operation was canceled.
|