You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Currently I check four projects each day for done tiles, three are moving slowly so if I could be notified when a tile had been marked done that would save me having to open the project. Saves processing time on the tile server since I wouldn't need to open each project to check for progress.
Saves by time as well.
Thanks John
The text was updated successfully, but these errors were encountered:
Currently I check four projects each day for done tiles, three are moving slowly so if I could be notified when a tile had been marked done that would save me having to open the project. Saves processing time on the tile server since I wouldn't need to open each project to check for progress.
Saves by time as well.
Thanks John
The text was updated successfully, but these errors were encountered: