Skip to content

feat(core): add customer_document_number in payment request #22798

feat(core): add customer_document_number in payment request

feat(core): add customer_document_number in payment request #22798

Triggered via pull request December 27, 2025 14:58
Status Cancelled
Total duration 24m 19s
Artifacts 1

cypress-tests-runner.yml

on: pull_request
Build hyperswitch server
16m 32s
Build hyperswitch server
Run formatter on Cypress tests and address lints
51s
Run formatter on Cypress tests and address lints
Run Cypress tests on v2 and generate coverage report
10m 30s
Run Cypress tests on v2 and generate coverage report
Run mandatory Cypress tests
7m 41s
Run mandatory Cypress tests
Run optional Cypress tests for alpha connectors
7m 40s
Run optional Cypress tests for alpha connectors
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 2 warnings
Run Cypress tests on v2 and generate coverage report
Process completed with exit code 1.
Run Cypress tests on v2 and generate coverage report
Process completed with exit code 101.
Run mandatory Cypress tests
Canceling since a higher priority waiting request for Run Cypress tests-refs/pull/10683/merge exists
Run mandatory Cypress tests
The operation was canceled.
Run Cypress tests
Canceling since a higher priority waiting request for Run Cypress tests-refs/pull/10683/merge exists
Run optional Cypress tests for alpha connectors
Canceling since a higher priority waiting request for Run Cypress tests-refs/pull/10683/merge exists
Run optional Cypress tests for alpha connectors
The operation was canceled.
Run Cypress tests on v2 and generate coverage report
No files were found with the provided path: cypress-tests-v2/cypress/reports/. No artifacts will be uploaded.
Run mandatory Cypress tests
Docker pull failed with exit code 1, back off 9.133 seconds before retry.

Artifacts

Produced during runtime
Name Size Digest
hyperswitch-server Expired
459 MB
sha256:279a977b6b312267a2c6877df3069ef85547025e730dfcf88ee9f1c12a4a59f0