Skip to content

APT3 CALDERA: Full Profile #26

@leegengyu

Description

@leegengyu

According to the Full profile of APT3 here, the 19 phases are executed in one-shot.

When adding an Operation to run this particular profile, we start off with the initial red group:
image

However, it appears that we are unable to change the group in which the Operation is based on, mid-way through the Operation. This is required because 3.B should be executed with the diy_eval group, and 4 - 5.A should be executed with yet another group. Else, the entire Operation is running only on the initial medium-integrity Agent callback (as seen in the yml file and also as tested). This would mean that that only around half of the Operation is executed correctly.

We can see that at the end of this Operation, there are only 2 Agents (the high-integrity one is spawned from 3.A, but none of the steps are carried out using it):
image

Is there something that I am doing wrong when running the Full profile, or is this a feature limitation in CALDERA in not being able to switch between Groups in a single Operation?

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions