Koz/cata conversion #254
covenant.yml
on: pull_request
Generate matrix from cabal
7s
Check Cabal file with cabal-gild
2m 30s
Matrix: tests
Annotations
19 errors
|
9.12.2 on ubuntu-latest
Process completed with exit code 1.
|
|
9.12.2 on ubuntu-latest:
test/json-conformance/Main.hs#L32
The import of ‘compileAndSerialize’
|
|
9.10.3 on windows-latest
The strategy configuration was canceled because "tests._9_12_2_ubuntu-latest" failed
|
|
9.10.3 on windows-latest
The operation was canceled.
|
|
9.12.2 on windows-latest
The strategy configuration was canceled because "tests._9_12_2_ubuntu-latest" failed
|
|
9.12.2 on windows-latest
The operation was canceled.
|
|
9.8.4 on windows-latest
The strategy configuration was canceled because "tests._9_12_2_ubuntu-latest" failed
|
|
9.8.4 on windows-latest
The operation was canceled.
|
|
9.8.4 on ubuntu-latest
The strategy configuration was canceled because "tests._9_12_2_ubuntu-latest" failed
|
|
9.8.4 on ubuntu-latest
The operation was canceled.
|
|
9.10.3 on ubuntu-latest
The strategy configuration was canceled because "tests._9_12_2_ubuntu-latest" failed
|
|
9.10.3 on ubuntu-latest
The operation was canceled.
|
|
9.10.3 on ubuntu-latest:
test/json-conformance/Main.hs#L32
The import of ‘compileAndSerialize’
|
|
9.10.3 on macos-latest
The strategy configuration was canceled because "tests._9_12_2_ubuntu-latest" failed
|
|
9.10.3 on macos-latest
The operation was canceled.
|
|
9.12.2 on macos-latest
The strategy configuration was canceled because "tests._9_12_2_ubuntu-latest" failed
|
|
9.12.2 on macos-latest
The operation was canceled.
|
|
9.8.4 on macos-latest
The strategy configuration was canceled because "tests._9_12_2_ubuntu-latest" failed
|
|
9.8.4 on macos-latest
The operation was canceled.
|