-
Notifications
You must be signed in to change notification settings - Fork 11
Open
Description
Venue
PST
Product
DISP-S1
SAS Version
No response
SDS Version
No response
Input Data
CASE 1: Missing large # of DISP-S1 at the beginning but has satellite acquisitions:
46541 (Edgecumbe, AK)
- missing data: 2016-10-18, 2016-11-11, 2017-08-08, 2017-08-20, 2017-09-01, 2017-09-13, 2017-09-25, 2017-10-07, 2017-10-19, 2017-10-31, 2017-11-12, 2018-04-17, 2018-04-29, 2018-05-11
11114 (Sacramento, CA) - missing data: 2016-08-10, 2016-09-03, 2016-09-27, 2016-10-21, 2016-11-14, 2016-12-08, 2017-01-01, 2017-01-01, 2017-01-13, 2017-01-19, 2017-01-25, 2017-02-18, 2017-03-14, 2017-03-26, 2017-04-07
CASE 2: Missing DISP-S1 in the middle but has satellite acquisitions:
08622 (New York, NY)
- missing data on 2021-02-08 and 2021-02-20
11115 (Central California, CA) - missing data: 2024-11-20 (there are more between 2016-2017 but may not satisfy the 27-burst requirement)
CASE 3: Needs restart after a large gap due to no satellite acquisition:
24726 (Salome, Az)
- run first historic processing from 2016-07-09 to 2021-08-06
- run forward mode for last batch: 2021-08-18 to 2021-10-19 (11 CSLCs). Note this must be connected with 2021-08-06.
- break the timeseries (no connection with 2021-10-19) and restart historic processing from 2025-05-29 to 2025-12-31 (there are 17 CSLCs so a ministack can be constructed)
33065 (Unimak, AK)
- run first historic processing from 2016-07-23 to 2020-10-12
- run forward mode for last batch: 2020-10-24 to 2021-10-19 (8 CSLCs). Note this must be connected with 2020-10-12.
- break the timeseries (no connection with 2021-10-19) and restart historic processing from 2025-05-29 to 2025-12-31 (there are 17 CSLCs so a ministack can be constructed)
Share Results
- Google Earth Engine (GEE)
- NASA Distributed Active Archive Centers (DAAC) User Acceptance Testing (UAT)
Additional Notes
No response
Metadata
Metadata
Assignees
Labels
No labels