Skip to content

examples: fix multithreaded example callconv #396

examples: fix multithreaded example callconv

examples: fix multithreaded example callconv #396

Re-run triggered December 25, 2025 18:43
Status Failure
Total duration 3m 59s
Artifacts

tests.yml

on: pull_request
Matrix: test_cross
Matrix: test_zig_015
Matrix: test_zig_nightly
Fit to window
Zoom out
Zoom in

Annotations

14 errors
test_zig_nightly (ubuntu-latest)
Process completed with exit code 2.
test_zig_nightly (ubuntu-24.04-arm)
The strategy configuration was canceled because "test_zig_nightly.ubuntu-latest" failed
test_zig_nightly (ubuntu-24.04-arm)
The operation was canceled.
test_cross (ubuntu-latest)
Process completed with exit code 2.
test_zig_nightly (macos-latest)
The strategy configuration was canceled because "test_zig_nightly.ubuntu-latest" failed
test_zig_nightly (macos-latest)
The operation was canceled.
test_zig_nightly (windows-latest)
The strategy configuration was canceled because "test_zig_nightly.ubuntu-latest" failed
test_zig_nightly (windows-latest)
The operation was canceled.
test_cross (ubuntu-24.04-arm)
The strategy configuration was canceled because "test_cross.ubuntu-latest" failed
test_cross (ubuntu-24.04-arm)
Process completed with exit code 2.
test_cross (macos-latest)
The strategy configuration was canceled because "test_cross.ubuntu-latest" failed
test_cross (macos-latest)
Process completed with exit code 2.
test_cross (windows-latest)
The strategy configuration was canceled because "test_cross.ubuntu-latest" failed
test_cross (windows-latest)
The operation was canceled.