authored andcommitted
First review and adding documents table
1 parent 88a52a7 commit 7702ed0

File tree

4 files changed

+12
-180
lines changed

4 files changed

+12
-180
lines changed
-3.54 KB
Binary file not shown.

Assessment_Report/sections/Assessment_Report.tex

Lines changed: 0 additions & 175 deletions
This file was deleted.

Assessment_Report/sections/answerstoquestions.tex

Lines changed: 2 additions & 2 deletions
Original file line numberDiff line numberDiff line change
@@ -95,12 +95,12 @@ \subsubsection{Personnel and responsibility [EN 50128 section 5.1 and 5.2] PQ}
9595
openETCS organization and came to following conclusions:
9696
9797
{}-- Although the validator belongs organizationally to WP4 he is an independent entity in the openETCS project and does
98-
not underlie the WPL1, WPL3, WPL5 nor WPL7.
98+
not underlie the WPL1, WPL3, WPL5 neither WPL7.
9999
100100
{}-- The verifiers are not the same persons as the entities integrator, Tester, requirements manager, designer nor
101101
implementer
102102
103-
{}-- The independency of the rest of the entities are guaranteed according to Figure 1.
103+
{}-- The independency of the rest of the entities is guaranteed according to Figure 1.
104104
105105
Due to the fact that every project partner is EN ISO 90001 certified in addition to the many technical discussions the
106106
assessors had held with the WPLs or the many attended openETCS Scrum meetings the assessors can confirm the competences

Assessment_Report/sections/introduction.tex

Lines changed: 10 additions & 3 deletions
Original file line numberDiff line numberDiff line change
@@ -34,15 +34,15 @@ \subsection{Contents of the assessment and issues of concern}
3434

3535
2. Are the measures taken for satisfying EN 50128 SIL 4 sufficient?
3636

37-
3. Does the agile development methodology applied in this project affects these measures taken for satisfying EN 50128?
37+
3. Does the agile development methodology applied in this project affect these measures taken for satisfying EN 50128?
3838

3939

4040
\bigskip
4141

4242
\subsection{Assessment conditions and exceptions}
4343
It should be noted:
4444

45-
{}-- The ETCS OBU software model has been developed with the closed source SCADE Suite of the company Systerel and the
45+
{}-- The ETCS OBU software model has been developed with the closed source SCADE Suite of the company ESTEREL Technology and the
4646
code generated is SIL4 certified. Hence only the deliverables of the openETCS Tool chain will have the scope of the
4747
assessment.
4848

@@ -56,5 +56,12 @@ \subsection{Documents for the software life cycle
5656
\bigskip
5757

5858

59+
\begin{figure}
60+
\label{documentmapping}
61+
\centering
62+
\includegraphics[width=21.001cm,height=16.341cm,angle=-90]{../images/documentmapping.pdf}
63+
\captionof{figure}{Mapping of openETCS Documents to the CENELEC Lifecycle}
64+
\end{figure}
5965

60-
Mapping\_openETCS\_Deliverables\_To\_EN50128-2011Docs
66+
67+