[BUGFIX] Improve URL generation for empty filenames and known documents #3428
integrate.yaml
on: pull_request
Unit test
/
Supported Versions Matrix
5s
Code Coverage
/
Code Coverage
5m 11s
Coding Standards
58s
Check architecture
46s
xml-lint
17s
Matrix: Lint root / Lint yaml & Composer
Matrix: Static analysis / Static Code Analysis
Matrix: Unit test / Tests
Matrix: Functional test / Tests
Matrix: integration test / Tests
Annotations
27 errors
|
integration test / Tests (8.5, locked)
Process completed with exit code 1.
|
|
integration test / Tests (8.5, highest)
The strategy configuration was canceled because "integration-tests.tests._8_5_locked" failed
|
|
integration test / Tests (8.3, locked)
The strategy configuration was canceled because "integration-tests.tests._8_5_locked" failed
|
|
integration test / Tests (8.4, locked)
The strategy configuration was canceled because "integration-tests.tests._8_5_locked" failed
|
|
integration test / Tests (8.2, locked)
The strategy configuration was canceled because "integration-tests.tests._8_5_locked" failed
|
|
integration test / Tests (8.2, locked)
The operation was canceled.
|
|
integration test / Tests (8.3, lowest)
The strategy configuration was canceled because "integration-tests.tests._8_5_locked" failed
|
|
integration test / Tests (8.3, lowest)
The operation was canceled.
|
|
integration test / Tests (8.2, highest)
The strategy configuration was canceled because "integration-tests.tests._8_5_locked" failed
|
|
integration test / Tests (8.2, highest)
The operation was canceled.
|
|
integration test / Tests (8.1, locked)
The strategy configuration was canceled because "integration-tests.tests._8_5_locked" failed
|
|
integration test / Tests (8.1, locked)
The operation was canceled.
|
|
integration test / Tests (8.1, highest)
The strategy configuration was canceled because "integration-tests.tests._8_5_locked" failed
|
|
integration test / Tests (8.1, highest)
The operation was canceled.
|
|
integration test / Tests (8.1, lowest)
The strategy configuration was canceled because "integration-tests.tests._8_5_locked" failed
|
|
integration test / Tests (8.1, lowest)
The operation was canceled.
|
|
integration test / Tests (8.4, highest)
The strategy configuration was canceled because "integration-tests.tests._8_5_locked" failed
|
|
integration test / Tests (8.4, highest)
The operation was canceled.
|
|
integration test / Tests (8.2, lowest)
The strategy configuration was canceled because "integration-tests.tests._8_5_locked" failed
|
|
integration test / Tests (8.2, lowest)
The operation was canceled.
|
|
integration test / Tests (8.3, highest)
The strategy configuration was canceled because "integration-tests.tests._8_5_locked" failed
|
|
integration test / Tests (8.3, highest)
The operation was canceled.
|
|
integration test / Tests (8.5, lowest)
The strategy configuration was canceled because "integration-tests.tests._8_5_locked" failed
|
|
integration test / Tests (8.5, lowest)
The operation was canceled.
|
|
integration test / Tests (8.4, lowest)
The strategy configuration was canceled because "integration-tests.tests._8_5_locked" failed
|
|
integration test / Tests (8.4, lowest)
The operation was canceled.
|
|
Code Coverage / Code Coverage
Process completed with exit code 1.
|