Bump connection_pool from 2.5.5 to 3.0.2 #9924
test.yml
on: pull_request
Matrix: rails
All required tests passing check
3s
Annotations
6 errors
|
Rails tests avo without pro (RubyGems latest, Ruby 3.4.4)
Process completed with exit code 1.
|
|
Rails tests system (RubyGems locked, Ruby 3.4.4)
Process completed with exit code 1.
|
|
Rails tests general (RubyGems locked, Ruby 3.4.4)
Process completed with exit code 1.
|
|
Rails tests general (RubyGems latest, Ruby 3.4.4)
Process completed with exit code 1.
|
|
Rails tests system (RubyGems latest, Ruby 3.4.4)
Process completed with exit code 1.
|
|
All required tests passing check
Process completed with exit code 1.
|