-
Notifications
You must be signed in to change notification settings - Fork 5
Open
Labels
Could'veMoSCoW Prioritization - Could/Good to Have Capability/FeatureMoSCoW Prioritization - Could/Good to Have Capability/FeatureResearchInvestigate how to do itInvestigate how to do itSize: MMedium - medium effort & riskMedium - medium effort & riskValue: 4Value to the insitute is highValue to the insitute is high
Description
Description
As developers we need to decide on a design for creating multiple pools as it is complex and there are multiple ways that we can create the architecture
Acceptance Criteria
The following outputs from the research are produced:
- Do we create a new 'flexible pooling' page or do we re-use the pool/new page?
- What changes do we make to the architecture for pooling e.g. batches of pools, pools of pools or another option
- A strategy for implementation. What do we do now to get the work into production vs the things that can be delayed.
Who the primary contacts are for this work
Steve / Ben / Seena
Knowledge or Stake holders
Tavis / Danni
Additional context or information
Notes from initial meeting:
- starting to do an automated form of pooling so will be created at the same time.
- Assigning samples to pool.
- Minimum - creating a file for each pool at the moment. Would like to upload a file for all pools.
- Batches of 24 samples. 8 csv files.
- Produce plates of 96 samples.
- story 1 - ability to create multiple pools and different tag sets, number the pools (bed position). Want to be for manual creation and file upload. In existing pooling page.
- story 2 - add documentation and example csv to pooling page.
- story 3 - create csv file download. Driver file.
- story 4 - research story to look at full automation to remove google sheet.
https://docs.google.com/document/d/1CHFK7n8oO2qCmqkNKaEOm5QiAJSAHT3mqQVg3HC9Sk8/edit?tab=t.0
Metadata
Metadata
Labels
Could'veMoSCoW Prioritization - Could/Good to Have Capability/FeatureMoSCoW Prioritization - Could/Good to Have Capability/FeatureResearchInvestigate how to do itInvestigate how to do itSize: MMedium - medium effort & riskMedium - medium effort & riskValue: 4Value to the insitute is highValue to the insitute is high