Annotation removal b #24
Triggered via pull request
October 24, 2025 11:59
Status
Cancelled
Total duration
12m 41s
Artifacts
–
pr.yml
on: pull_request
check_format_and_unit_tests
1m 47s
Matrix: build / httpclient-tests
Matrix: build / integration_tests
Matrix: build / special_integration_tests
Annotations
49 errors
|
build / Special integration tests (17)
Process completed with exit code 1.
|
|
build / Special integration tests (25)
The strategy configuration was canceled because "build.special_integration_tests._17" failed
|
|
build / Special integration tests (25)
The operation was canceled.
|
|
build / Special integration tests (21)
The strategy configuration was canceled because "build.special_integration_tests._17" failed
|
|
build / Special integration tests (21)
The operation was canceled.
|
|
build / integration_tests (17, 1.31.8) / Integration tests (17, 1.31.8, vertx)
Process completed with exit code 1.
|
|
build / integration_tests (17, 1.30.12) / Integration tests (17, 1.30.12, vertx)
The strategy configuration was canceled because "build.integration_tests._17_1_31_8" failed
|
|
build / integration_tests (17, 1.33.1) / Integration tests (17, 1.33.1, vertx)
The strategy configuration was canceled because "build.integration_tests._17_1_31_8" failed
|
|
build / integration_tests (17, 1.33.1) / Integration tests (17, 1.33.1, vertx)
The operation was canceled.
|
|
build / integration_tests (25, 1.30.12) / Integration tests (25, 1.30.12, vertx)
The strategy configuration was canceled because "build.integration_tests._17_1_31_8" failed
|
|
build / integration_tests (25, 1.30.12) / Integration tests (25, 1.30.12, vertx)
The operation was canceled.
|
|
build / integration_tests (21, 1.32.4) / Integration tests (21, 1.32.4, vertx)
The strategy configuration was canceled because "build.integration_tests._17_1_31_8" failed
|
|
build / integration_tests (21, 1.32.4) / Integration tests (21, 1.32.4, vertx)
The operation was canceled.
|
|
build / integration_tests (25, 1.33.1) / Integration tests (25, 1.33.1, vertx)
The strategy configuration was canceled because "build.integration_tests._17_1_31_8" failed
|
|
build / integration_tests (25, 1.33.1) / Integration tests (25, 1.33.1, vertx)
The operation was canceled.
|
|
build / integration_tests (21, 1.31.8) / Integration tests (21, 1.31.8, vertx)
The strategy configuration was canceled because "build.integration_tests._17_1_31_8" failed
|
|
build / integration_tests (21, 1.31.8) / Integration tests (21, 1.31.8, vertx)
The operation was canceled.
|
|
build / integration_tests (17, 1.32.4) / Integration tests (17, 1.32.4, vertx)
The strategy configuration was canceled because "build.integration_tests._17_1_31_8" failed
|
|
build / integration_tests (17, 1.32.4) / Integration tests (17, 1.32.4, vertx)
The operation was canceled.
|
|
build / integration_tests (21, 1.30.12) / Integration tests (21, 1.30.12, vertx)
The strategy configuration was canceled because "build.integration_tests._17_1_31_8" failed
|
|
build / integration_tests (21, 1.30.12) / Integration tests (21, 1.30.12, vertx)
The operation was canceled.
|
|
build / integration_tests (25, 1.32.4) / Integration tests (25, 1.32.4, vertx)
The strategy configuration was canceled because "build.integration_tests._17_1_31_8" failed
|
|
build / integration_tests (25, 1.32.4) / Integration tests (25, 1.32.4, vertx)
The operation was canceled.
|
|
build / integration_tests (21, 1.33.1) / Integration tests (21, 1.33.1, vertx)
The strategy configuration was canceled because "build.integration_tests._17_1_31_8" failed
|
|
build / integration_tests (21, 1.33.1) / Integration tests (21, 1.33.1, vertx)
The operation was canceled.
|
|
build / integration_tests (25, 1.31.8) / Integration tests (25, 1.31.8, vertx)
The strategy configuration was canceled because "build.integration_tests._17_1_31_8" failed
|
|
build / integration_tests (25, 1.31.8) / Integration tests (25, 1.31.8, vertx)
The operation was canceled.
|
|
build / httpclient-tests (vertx) / Integration tests (25, 1.32.0, vertx)
Canceling since a higher priority waiting request for refs/pull/7/merge-Verify Pull Request exists
|
|
build / httpclient-tests (vertx) / Integration tests (25, 1.32.0, vertx)
The operation was canceled.
|
|
build / httpclient-tests (jdk) / Integration tests (25, 1.32.0, jdk)
Canceling since a higher priority waiting request for refs/pull/7/merge-Verify Pull Request exists
|
|
build / httpclient-tests (jdk) / Integration tests (25, 1.32.0, jdk)
The operation was canceled.
|
|
Verify Pull Request
Canceling since a higher priority waiting request for refs/pull/7/merge-Verify Pull Request exists
|
|
Verify Pull Request
Canceling since a higher priority waiting request for refs/pull/7/merge-Verify Pull Request exists
|
|
Verify Pull Request
Canceling since a higher priority waiting request for refs/pull/7/merge-Verify Pull Request exists
|
|
Verify Pull Request
Canceling since a higher priority waiting request for refs/pull/7/merge-Verify Pull Request exists
|
|
Verify Pull Request
Canceling since a higher priority waiting request for refs/pull/7/merge-Verify Pull Request exists
|
|
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._17_1_31_8" failed
|
|
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._17_1_31_8" failed
|
|
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._17_1_31_8" failed
|
|
build / httpclient-tests (jetty) / Integration tests (25, 1.32.0, jetty)
Canceling since a higher priority waiting request for refs/pull/7/merge-Verify Pull Request exists
|
|
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._17_1_31_8" failed
|
|
build / httpclient-tests (jetty) / Integration tests (25, 1.32.0, jetty)
The operation was canceled.
|
|
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._17_1_31_8" failed
|
|
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._17_1_31_8" failed
|
|
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._17_1_31_8" failed
|
|
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._17_1_31_8" failed
|
|
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._17_1_31_8" failed
|
|
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._17_1_31_8" failed
|
|
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._17_1_31_8" failed
|