Skip to content

chore(deps): bump the geoarrow group with 9 updates #2341

chore(deps): bump the geoarrow group with 9 updates

chore(deps): bump the geoarrow group with 9 updates #2341

Triggered via pull request January 13, 2026 12:12
Status Failure
Total duration 3m 43s
Artifacts

ci.yml

on: pull_request
Matrix: Test stac
Matrix: Test pgstac
Fit to window
Zoom out
Zoom in

Annotations

8 errors
Docs
Process completed with exit code 101.
Check (nightly)
Process completed with exit code 101.
msrv
Process completed with exit code 1.
Test
Process completed with exit code 1.
Validate
Process completed with exit code 101.
Test pgstac (v0.9.8)
Process completed with exit code 101.
Test pgstac (v0.8.6)
The strategy configuration was canceled because "test-pgstac.v0_9_8" failed
Test pgstac (v0.8.6)
The operation was canceled.