Skip to content

chore: light dependency cleanup #318

chore: light dependency cleanup

chore: light dependency cleanup #318

Triggered via pull request October 21, 2025 21:42
Status Failure
Total duration 39s
Artifacts

continuous-integration.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build (3.9)
Process completed with exit code 3.
build (3.12)
The strategy configuration was canceled because "build._3_9" failed
build (3.12)
The operation was canceled.
build (3.13)
The strategy configuration was canceled because "build._3_9" failed
build (3.13)
The operation was canceled.
build (3.10)
The strategy configuration was canceled because "build._3_9" failed
build (3.10)
The operation was canceled.
build (3.11)
The strategy configuration was canceled because "build._3_9" failed
build (3.11)
The operation was canceled.