There is a need after discussion with @bob-carpenter to have point estimates of moments with many more draws that the current 10k reference draws. At the same time, we most likely want to compare many posteriors with similar number of reference draws. Hence, one solution is to store multiple reference draws based on different numbers of reference draws, say 10k, 100k, 1M, 10M etc.
A first step would be to think of how to incorporate this structure intuitively and then add many more point estimates.