The goal of this milestone is to consolidate our current work to create a next version of the PAPRA that can be another OSHWA certified part. To be done in this milestone: 1. complete 96 mm fan investigation. Darryl has 4 fans to validate for > 3hr battery life. 2. upload 120 mm fan parts. Validate for > 3 hr battery life. 3. upload and validate new board container parts. Validation through running for full battery cycles. 4. upload and validate new CPAP hose connector parts. Validation through pressure monitoring 5. Write documentation for (96/120) box assembly, hose assembly, board assembly, validation steps.
Overdue by 2 year(s)•Due by September 2, 2023•0/4 issues closedmigrate board & schematic design files from Eagle to KiCAD
No due date•0/1 issues closedrelease for updating BOM (source code, parts list, tools list, & assembly instructions) with ThruHole board assembly option
No due date•0/2 issues closedLooking at higher flow filtration reaching n99 and making sure that the boards/efuses are functioning as expected
Overdue by 3 year(s)•Due by December 18, 2021•1/4 issues closed