Milestones

List view

  • Overdue by 1 year(s)
    Due by April 4, 2024
    3/8 issues closed
  • The goal of this milestone is to consolidate our current work to create a next version of the PAPRA that can be another OSHWA certified part. To be done in this milestone: 1. complete 96 mm fan investigation. Darryl has 4 fans to validate for > 3hr battery life. 2. upload 120 mm fan parts. Validate for > 3 hr battery life. 3. upload and validate new board container parts. Validation through running for full battery cycles. 4. upload and validate new CPAP hose connector parts. Validation through pressure monitoring 5. Write documentation for (96/120) box assembly, hose assembly, board assembly, validation steps.

    Overdue by 2 year(s)
    Due by September 2, 2023
    0/7 issues closed
  • Need a new mask design to have a line in the sand to have a completed product

    Overdue by 3 year(s)
    Due by June 17, 2022
  • This PR covers adjusting the clip design holding the filter in place on the fan box, and includes such adjustments as the 30mm fan outlet, fixing the efuse circuit, and the like.

    Overdue by 4 year(s)
    Due by October 31, 2021
    1/2 issues closed
  • Publish article on PAPRa on Journal of Open Hardware https://openhardware.metajnl.com/

    No due date
    3/19 issues closed