Skip to content

Enabling multi cluster node #486

Enabling multi cluster node

Enabling multi cluster node #486

Triggered via push November 28, 2025 12:14
Status Failure
Total duration 17m 41s
Artifacts

ci.yaml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

12 errors
build (3.13)
Process completed with exit code 1.
build (3.11)
Process completed with exit code 1.
build (3.12)
The strategy configuration was canceled because "build._3_13" failed
build (3.12)
Process completed with exit code 1.
build (3.8)
The strategy configuration was canceled because "build._3_13" failed
build (3.8)
Process completed with exit code 1.
build (pypy3.10)
The strategy configuration was canceled because "build._3_13" failed
build (pypy3.10)
Process completed with exit code 1.
build (3.9)
The strategy configuration was canceled because "build._3_13" failed
build (3.9)
The operation was canceled.
build (3.10)
The strategy configuration was canceled because "build._3_13" failed
build (3.10)
The operation was canceled.