Skip to content

Bump actions/checkout from 3 to 4 #29

Bump actions/checkout from 3 to 4

Bump actions/checkout from 3 to 4 #29

Triggered via push September 25, 2024 07:12
Status Cancelled
Total duration 2m 7s
Artifacts

docker.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

4 errors
build (focal)
The run was canceled by @andy5995.
build (focal)
The operation was canceled.
build (jammy)
The run was canceled by @andy5995.
build (jammy)
The operation was canceled.