Skip to content

Fix JSON issues

Fix JSON issues #27

Triggered via push April 19, 2024 05:35
Status Failure
Total duration 51s
Artifacts

go.yaml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (1.19)
Process completed with exit code 2.
build (1.21)
The job was canceled because "_1_19" failed.
build (1.21)
The operation was canceled.
build (1.20)
The job was canceled because "_1_19" failed.
build (1.20)
The operation was canceled.