Skip to content

Milestones

List view

  • Issues to tackle once the software for 6.17 is live in production

    No due date
    1/1 issues closed
  • Issues which need to be closed by interacting with the live 6.11 portal once it's in production.

    Due by March 29, 2024
    1/1 issues closed
  • No due date
    7/7 issues closed
  • No due date
    7/7 issues closed
  • Making HK's life easier with .cfg file updates and data models that can be included on any web page in any number.

    Due by January 17, 2025
    6/6 issues closed
  • No due date
    4/4 issues closed
  • No due date
    4/4 issues closed
  • Due by September 20, 2024
    5/5 issues closed
  • Due by July 19, 2024
    2/2 issues closed
  • Postponed two months due to EDRN Steering Committee meeting in April and @nutjob4life vacation in May.

    Due by June 21, 2024
    8/8 issues closed
  • Due by March 15, 2024
    6/6 issues closed
  • In addition to upgrading Wagtail to 5.2.3, this release has a few new features (new information on protocols, PIs on the "wall of shame", the missing Reference Set Working Group) and a few security improvements (jQuery upgrade, resource integrity, autocompletion being disabled on password fields), and some minor bug fixes. For web page editors, it fixes the image float feature.

    Due by February 16, 2024
    12/12 issues closed
  • New kind of EDRN site, Wagtail upgrade, several new features, and some minor bug fixes

    Due by January 19, 2024
    12/12 issues closed
  • Small enhancements and bug fixes

    Due by December 15, 2023
    6/6 issues closed
  • Live changes to complete 6.7 that must be done through-the-web rather than in the delivered code.

    Due by November 30, 2023
    1/1 issues closed
  • Issues that need to be addressed once 6.6 is live in production. These are typically content changes that are done through-the-web.

    No due date
    1/1 issues closed
  • This release contains a mix of fixes for bugs, some new features, and infrastructure upgrades.

    Due by November 17, 2023
    16/16 issues closed
  • Issues that need to be addressed using the content management features of Wagtail after 6.5 has gone live. This was our routine monthly release, but NCI/CBIIT dropped the ball and never got this to even the STAGE tier. We have moved the closed issues of 6.5-post-lvie to 6.6-post-live. Shame.

    No due date
  • All of the features of 6.5 which never even got to the STAGE tier at NCI, plus the new Government Shutdown banner feature = 6.6

    Due by October 20, 2023
    6/6 issues closed
  • This was our routine monthly release, but NCI/CBIIT dropped the ball and never got this to even the STAGE tier. We have moved the closed issues of 6.5 to 6.6. Shame.

    Due by September 15, 2023
    1/1 issues closed
  • Issues about P5 that need to be addressed _after_ 6.4 goes live. These are typically things that are configured through-the-web (TTW) such as control panel secrets or content updates.

    No due date
    2/2 issues closed
  • New features

    No due date
    5/5 issues closed
  • This is primarily a bug-fix only release. New features will be occur in 6.4.

    Due by July 6, 2023
    4/4 issues closed
  • This milestone collects issues that should be addressed once 6.2 is live at NCI

    No due date
    1/1 issues closed
  • Fixes from discoveries in the "STAGE" tier

    No due date
    1/1 issues closed
  • Security scan mitigations from 6.0.0

    No due date
    1/1 issues closed
  • These are issues that need to be addressed after 6.1.0 is live, through the admin control panel or other post-live settings.

    No due date
    1/1 issues closed
  • This release of P5 has several new features, including CC'ing the submitter of a Specimen Request Form, the Dataset Metadata Form, and the LabCAS API page. It also makes some minor corrections to some broken links and page names. It also has a major Search Engine Optimization improvement, providing SEO metadata to over 6000 pages that were missing it.

    Due by May 9, 2023
    14/14 issues closed
  • Final CBIIT-blessed release for both STAGE and PROD tiers

    No due date
    1/1 issues closed
  • Ingest bug fix release

    Due by February 10, 2023
    1/1 issues closed
  • Hand curation of data that has to occur after the new software.

    Due by February 27, 2023
    2/2 issues closed
  • Primary evolutionary path for P5, the EDRN Production Program for the Public/Private Portal (P5).

    Due by April 1, 2023
    16/16 issues closed
  • Fixing bugs and adding "paperless" features: working groups, committees, and organ collaborative groups documents, event handling, and so forth.

    Due by February 21, 2023
    47/47 issues closed
  • Bug fixes for 5.1.4

    No due date
    3/3 issues closed
  • Maintenance release for P5

    No due date
    4/4 issues closed
  • Bug fix release for 5.1.2

    Due by February 17, 2022
    13/13 issues closed
  • Bugfix release for 5.1.1 as well as new branding and 21st Century IDEA requirements.

    Due by October 30, 2021
    7/7 issues closed
  • Bugfix release for 5.1.0 and new features for protocols.

    Due by July 30, 2021
    13/13 issues closed
  • Issues for the immediately imminent (😂) release of the P5 "power level five" EDRN portal.

    Due by May 31, 2020
    8/8 issues closed
  • New features and fixes of the EDRN "power level five" public portal and knowledge environment, but especially the Python 3 upgrade. Python 2 reached end-of-life on 2020-01-01. Yes, we are late. Really late.

    Due by April 14, 2021
    41/41 issues closed
  • More bug fixes of the EDRN "power level five" public portal and knowledge environment, but also some new features to support ease of navigation and organization. As far as end users are concerned this is "API compatible".

    Due by October 7, 2020
    11/11 issues closed
  • Another bug fix release of the EDRN "power level five" public portal and knowledge environment.

    Due by June 30, 2020
    21/21 issues closed
  • Bug fix release of the P5 "power level five" version of the EDRN Public Portal.

    Due by June 1, 2020
    6/6 issues closed