Move the update doc examples script to a later stage in the CI pipeline #12061
Triggered via pull request
January 25, 2025 05:47
Status
Cancelled
Total duration
15m 15s
Artifacts
–
ci.yaml
on: pull_request
Pre-build checks
12m 49s
Check Nix Flake
14m 42s
Update examples in doc schemas
1m 45s
Matrix: compile
Run fuzz regression tests
1m 46s
Matrix: Run unit tests
Matrix: Sanitizers Test CLN
Matrix: integration-valgrind
Matrix: integration
Matrix: min-btc-support
CI completion
0s
Annotations
13 errors
Update examples in doc schemas
Process completed with exit code 2.
|
Compile CLN compile-clang-sanitizers
Canceling since a higher priority waiting request for 'Continuous Integration-8034' exists
|
Compile CLN compile-clang-sanitizers
The operation was canceled.
|
Run fuzz regression tests
Canceling since a higher priority waiting request for 'Continuous Integration-8034' exists
|
Run fuzz regression tests
The operation was canceled.
|
Compile CLN compile-gcc-O3
Canceling since a higher priority waiting request for 'Continuous Integration-8034' exists
|
Compile CLN compile-gcc-O3
The operation was canceled.
|
Check Nix Flake
Canceling since a higher priority waiting request for 'Continuous Integration-8034' exists
|
Check Nix Flake
The operation was canceled.
|
Compile CLN compile-gcc
Canceling since a higher priority waiting request for 'Continuous Integration-8034' exists
|
Compile CLN compile-gcc
The operation was canceled.
|
Compile CLN compile-clang
Canceling since a higher priority waiting request for 'Continuous Integration-8034' exists
|
Compile CLN compile-clang
The operation was canceled.
|