Splice: Interop Final (probably) with Eclair #12121
ci.yaml
on: pull_request
Pre-build checks
13m 2s
Check Nix Flake
18m 0s
Matrix: compile
Run fuzz regression tests
9m 11s
Matrix: Run unit tests
Matrix: Sanitizers Test CLN
Matrix: integration-valgrind
Matrix: integration
Matrix: min-btc-support
CI completion
0s
Annotations
43 errors
Update examples in doc schemas
Process completed with exit code 2.
|
Test CLN dual-fund
Process completed with exit code 1.
|
Test CLN splicing
The job was canceled because "dual-fund_compile-gcc_sql" failed.
|
Test CLN splicing
The operation was canceled.
|
Test CLN liquid
The job was canceled because "dual-fund_compile-gcc_sql" failed.
|
Test CLN postgres
The job was canceled because "dual-fund_compile-gcc_sql" failed.
|
Test CLN liquid
The operation was canceled.
|
Test CLN postgres
The operation was canceled.
|
Test CLN clang
The job was canceled because "dual-fund_compile-gcc_sql" failed.
|
Test CLN clang
The operation was canceled.
|
Test CLN gcc
The job was canceled because "dual-fund_compile-gcc_sql" failed.
|
Test CLN gcc
The operation was canceled.
|
Sanitizers Test CLN (ASan/UBSan (05/10), --test-group=5 --test-group-count=10)
Process completed with exit code 1.
|
Sanitizers Test CLN (ASan/UBSan (01/10), --test-group=1 --test-group-count=10)
The job was canceled because "ASan_UBSan__05_10__--test" failed.
|
Sanitizers Test CLN (ASan/UBSan (01/10), --test-group=1 --test-group-count=10)
The operation was canceled.
|
Sanitizers Test CLN (ASan/UBSan (04/10), --test-group=4 --test-group-count=10)
The job was canceled because "ASan_UBSan__05_10__--test" failed.
|
Sanitizers Test CLN (ASan/UBSan (04/10), --test-group=4 --test-group-count=10)
The operation was canceled.
|
Sanitizers Test CLN (ASan/UBSan (06/10), --test-group=6 --test-group-count=10)
The job was canceled because "ASan_UBSan__05_10__--test" failed.
|
Sanitizers Test CLN (ASan/UBSan (06/10), --test-group=6 --test-group-count=10)
The operation was canceled.
|
Sanitizers Test CLN (ASan/UBSan (09/10), --test-group=9 --test-group-count=10)
The job was canceled because "ASan_UBSan__05_10__--test" failed.
|
Sanitizers Test CLN (ASan/UBSan (09/10), --test-group=9 --test-group-count=10)
The operation was canceled.
|
Sanitizers Test CLN (ASan/UBSan (10/10), --test-group=10 --test-group-count=10)
The job was canceled because "ASan_UBSan__05_10__--test" failed.
|
Sanitizers Test CLN (ASan/UBSan (10/10), --test-group=10 --test-group-count=10)
The operation was canceled.
|
Sanitizers Test CLN (ASan/UBSan (02/10), --test-group=2 --test-group-count=10 -n 1)
The job was canceled because "ASan_UBSan__05_10__--test" failed.
|
Sanitizers Test CLN (ASan/UBSan (02/10), --test-group=2 --test-group-count=10 -n 1)
The operation was canceled.
|
Sanitizers Test CLN (ASan/UBSan (08/10), --test-group=8 --test-group-count=10)
The job was canceled because "ASan_UBSan__05_10__--test" failed.
|
Sanitizers Test CLN (ASan/UBSan (08/10), --test-group=8 --test-group-count=10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (09/10)
Process completed with exit code 1.
|
Valgrind Test CLN Valgrind (10/10)
The job was canceled because "Valgrind__09_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (10/10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (08/10)
The job was canceled because "Valgrind__09_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (08/10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (01/10)
The job was canceled because "Valgrind__09_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (01/10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (04/10)
The job was canceled because "Valgrind__09_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (04/10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (02/10)
The job was canceled because "Valgrind__09_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (02/10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (05/10)
The job was canceled because "Valgrind__09_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (05/10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (06/10)
The job was canceled because "Valgrind__09_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (06/10)
The operation was canceled.
|
Test minimum supported BTC v25.0 with clang
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
cln-compile-clang-sanitizers.tar.bz2
|
200 MB |
|
cln-compile-clang.tar.bz2
|
137 MB |
|
cln-compile-gcc-O3.tar.bz2
|
170 MB |
|
cln-compile-gcc.tar.bz2
|
136 MB |
|