Skip to content

Splice: Interop Final (probably) with Eclair #12122

Splice: Interop Final (probably) with Eclair

Splice: Interop Final (probably) with Eclair #12122

Triggered via pull request February 1, 2025 22:15
Status Failure
Total duration 1h 9m 40s
Artifacts 4

ci.yaml

on: pull_request
Matrix: compile
Run fuzz regression tests
9m 13s
Run fuzz regression tests
Matrix: Run unit tests
Matrix: Sanitizers Test CLN
Matrix: integration-valgrind
Matrix: integration
Matrix: min-btc-support
Update examples in doc schemas
4m 1s
Update examples in doc schemas
CI completion
0s
CI completion
Fit to window
Zoom out
Zoom in

Annotations

45 errors
Update examples in doc schemas
Process completed with exit code 2.
Sanitizers Test CLN (ASan/UBSan (05/10), --test-group=5 --test-group-count=10)
Process completed with exit code 1.
Sanitizers Test CLN (ASan/UBSan (01/10), --test-group=1 --test-group-count=10)
The job was canceled because "ASan_UBSan__05_10__--test" failed.
Sanitizers Test CLN (ASan/UBSan (09/10), --test-group=9 --test-group-count=10)
The job was canceled because "ASan_UBSan__05_10__--test" failed.
Sanitizers Test CLN (ASan/UBSan (08/10), --test-group=8 --test-group-count=10)
The job was canceled because "ASan_UBSan__05_10__--test" failed.
Sanitizers Test CLN (ASan/UBSan (10/10), --test-group=10 --test-group-count=10)
The job was canceled because "ASan_UBSan__05_10__--test" failed.
Sanitizers Test CLN (ASan/UBSan (02/10), --test-group=2 --test-group-count=10 -n 1)
The job was canceled because "ASan_UBSan__05_10__--test" failed.
Sanitizers Test CLN (ASan/UBSan (04/10), --test-group=4 --test-group-count=10)
The job was canceled because "ASan_UBSan__05_10__--test" failed.
Sanitizers Test CLN (ASan/UBSan (06/10), --test-group=6 --test-group-count=10)
The job was canceled because "ASan_UBSan__05_10__--test" failed.
Test CLN dual-fund
Process completed with exit code 1.
Test CLN splicing
The job was canceled because "dual-fund_compile-gcc_sql" failed.
Test CLN splicing
The operation was canceled.
Test CLN clang
The job was canceled because "dual-fund_compile-gcc_sql" failed.
Test CLN clang
The operation was canceled.
Test CLN gcc
The job was canceled because "dual-fund_compile-gcc_sql" failed.
Test CLN gcc
The operation was canceled.
Test CLN postgres
The job was canceled because "dual-fund_compile-gcc_sql" failed.
Test CLN postgres
The operation was canceled.
Test CLN liquid
The job was canceled because "dual-fund_compile-gcc_sql" failed.
Test CLN liquid
The operation was canceled.
Valgrind Test CLN Valgrind (09/10)
Process completed with exit code 1.
Valgrind Test CLN Valgrind (04/10)
The job was canceled because "Valgrind__09_10__--test-g" failed.
Valgrind Test CLN Valgrind (04/10)
The operation was canceled.
Valgrind Test CLN Valgrind (01/10)
The job was canceled because "Valgrind__09_10__--test-g" failed.
Valgrind Test CLN Valgrind (01/10)
The operation was canceled.
Valgrind Test CLN Valgrind (05/10)
The job was canceled because "Valgrind__09_10__--test-g" failed.
Valgrind Test CLN Valgrind (05/10)
The operation was canceled.
Valgrind Test CLN Valgrind (02/10)
The job was canceled because "Valgrind__09_10__--test-g" failed.
Valgrind Test CLN Valgrind (02/10)
The operation was canceled.
Valgrind Test CLN Valgrind (10/10)
The job was canceled because "Valgrind__09_10__--test-g" failed.
Valgrind Test CLN Valgrind (10/10)
The operation was canceled.
Valgrind Test CLN Valgrind (08/10)
The job was canceled because "Valgrind__09_10__--test-g" failed.
Valgrind Test CLN Valgrind (08/10)
The operation was canceled.
Valgrind Test CLN Valgrind (06/10)
The job was canceled because "Valgrind__09_10__--test-g" failed.
Valgrind Test CLN Valgrind (06/10)
The operation was canceled.
Valgrind Test CLN Valgrind (07/10)
The job was canceled because "Valgrind__09_10__--test-g" failed.
Valgrind Test CLN Valgrind (07/10)
The operation was canceled.
Test minimum supported BTC v25.0 with clang
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
cln-compile-clang-sanitizers.tar.bz2
200 MB
cln-compile-clang.tar.bz2
137 MB
cln-compile-gcc-O3.tar.bz2
170 MB
cln-compile-gcc.tar.bz2
136 MB