Skip to content

🧪🔬This repository contains the task submissions of the team #3469 of E-YANTRA 2019-2020.👨‍💻⚡

Notifications You must be signed in to change notification settings

LiquidatorCoder/eYRC-3469-2019-Task-Submissions

Repository files navigation

E-YANTRA 2019-2020 TASK SUBMISSIONS (Team ID - 3469)

Theme - Construct-o-Bot

Theme

Environmental conditions such as extreme rainfall, earthquakes, landslides and floods often cause natural disasters which lead to tremendous loss of life and property, causing great disruption in people’s lives and the economy. In 2018, across the world there were 315 natural disaster events recorded with 11,804 deaths, over 68 millions of people were affected, and 131.7 billion dollars in economic losses.

After a disaster strikes, governments and private organizations engage in reconstruction efforts of infrastructure, such as roads, bridges, power and railway lines, houses etc. This is a very labor and capital-intensive task. Moreover, doing this at a disaster site, with its multiple associated risks and challenging terrain, poses an additional challenge. Motivated by this scenario, in order to help the needy victims in the affected areas, this edition of e-Yantra Robotics Competition (eYRC 2019-20) presents the theme Contruct-o-Bot.

In this theme, the arena is an abstraction of a disaster site where the robot picks the construction material and traverses paths in order to deposit it at the site to be reconstructed. In order to maneuver over these paths, the Construct-O-Bot has to use intelligent line-following and path-planning algorithms to reach safely and quickly using shortest paths. After reaching the site, the Construct-O-Bot carefully has to place the material at the required positions which may include placing the material at different heights from the ground. It has to deposit all required material at multiple construction sites, navigating through various terrains.

The team that finishes the given task in the least amount of time whilst incurring the least penalties will be declared the winner.

Results

Task 0

Task 0 Graph

Remark : Visual Studio Installed and V_REP Installed Passed

Task 1.1

95/100 Task 1.1 Graph

Remark : Good Work

Task 1.2

88/100 Task 1.2 Graph

Remark : You have picked 7 and placed 2

Task 2

Remark : Good

Task 3

88/100 Task 3 Graph

Remark : Good Work

Task 4

433/380 (30% bonus for early submission) Task 4 Graph

Remark : Good work, Make your arm sturdy.

Task 5

Original Configuration: 1494

Bonus Configuration: 1315

Code: 50

Total = 1494 + (1315*0.33) + 50 = 1982 Task 5 Graph

Remark : Original Configuration: Had penalty and missed one pick and drop

Demo

Hardware Testing

https://youtu.be/kqlR-GdEUJE

Robot Testing

https://youtu.be/lDrcOotHkA0

Task 4

https://youtu.be/vr7ZOj5xuTk

https://youtu.be/OVagyDxdAV0

Task 5

Original Configuration

https://youtu.be/pC9cgT4azlI

Bonus Configuration

https://youtu.be/SYDLNNLTBhI

About

🧪🔬This repository contains the task submissions of the team #3469 of E-YANTRA 2019-2020.👨‍💻⚡

Topics

Resources

Stars

Watchers

Forks

Releases

No releases published

Packages

No packages published