feat: add KeyringClientV2 support
#2289
main.yml
on: pull_request
Matrix: Build, lint, and test / Prepare
Check workflows
4s
Matrix: Build, lint, and test / Build
Matrix: Build, lint, and test / Lint
Matrix: Build, lint, and test / Test
Matrix: Build, lint, and test / Validate changelog
Determine whether this is a release merge commit
0s
Publish release
/
Publish to NPM
Annotations
7 errors
|
Build, lint, and test / Lint (22.x)
Process completed with exit code 1.
|
|
Build, lint, and test / Test (18.x)
Process completed with exit code 1.
|
|
Build, lint, and test / Test (22.x)
The strategy configuration was canceled because "build-lint-test.test._18_x" failed
|
|
Build, lint, and test / Test (22.x)
The operation was canceled.
|
|
Build, lint, and test / Test (20.x)
The strategy configuration was canceled because "build-lint-test.test._18_x" failed
|
|
Build, lint, and test / Test (20.x)
The operation was canceled.
|
|
All jobs pass
Process completed with exit code 1.
|