Skip to content

Merge branch 'pv-csp-hybrid-gui' into csp-controller-target-net-power #5466

Merge branch 'pv-csp-hybrid-gui' into csp-controller-target-net-power

Merge branch 'pv-csp-hybrid-gui' into csp-controller-target-net-power #5466

Triggered via push September 23, 2025 22:03
Status Failure
Total duration 6h 1m 50s
Artifacts

ci.yml

on: push
Matrix: build-mac
Matrix: build-ubuntu
Matrix: build-windows
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 1 notice
build-mac (macos-latest)
Process completed with exit code 2.
build-mac (macos-14-large)
The operation was canceled.
build-mac (macos-14-large)
The strategy configuration was canceled because "build-mac.macos-latest" failed
build-ubuntu (3.10)
The operation was canceled.
build-ubuntu (3.10)
The job has exceeded the maximum execution time of 6h0m0s
build-windows (3.10)
The windows-latest label will migrate from Windows Server 2022 to Windows Server 2025 beginning September 2, 2025. For more information see https://github.com/actions/runner-images/issues/12677