Skip to content

Backport #399 PR for package building #273

Backport #399 PR for package building

Backport #399 PR for package building #273

Triggered via push August 19, 2025 16:28
Status Failure
Total duration 26s
Artifacts

deploy.yml

on: push
Matrix: build
release
0s
release
Fit to window
Zoom out
Zoom in

Annotations

18 errors
build (ubuntu:20.04)
The operation was canceled.
build (ubuntu:20.04)
The strategy configuration was canceled because "build.ubuntu_18_04" failed
build (ubuntu:22.04)
The operation was canceled.
build (ubuntu:22.04)
The strategy configuration was canceled because "build.ubuntu_18_04" failed
build (fedora:41)
The operation was canceled.
build (fedora:41)
The strategy configuration was canceled because "build.ubuntu_18_04" failed
build (debian:13)
The operation was canceled.
build (debian:13)
The strategy configuration was canceled because "build.ubuntu_18_04" failed
build (fedora:40)
The operation was canceled.
build (fedora:40)
The strategy configuration was canceled because "build.ubuntu_18_04" failed
build (debian:12)
The operation was canceled.
build (archlinux:latest)
The operation was canceled.
build (debian:12)
The strategy configuration was canceled because "build.ubuntu_18_04" failed
build (archlinux:latest)
The strategy configuration was canceled because "build.ubuntu_18_04" failed
build (fedora:42)
The operation was canceled.
build (fedora:42)
The strategy configuration was canceled because "build.ubuntu_18_04" failed
build (ubuntu:25.04)
The operation was canceled.
build (ubuntu:25.04)
The strategy configuration was canceled because "build.ubuntu_18_04" failed