16 changes: 9 additions & 7 deletions examples/02_run_openfast_cases/IEA-15-240-RWT.yaml
Original file line number Diff line number Diff line change
Expand Up @@ -745,20 +745,22 @@ environment:
bos:
plant_turbine_spacing: 7
plant_row_spacing: 7
commissioning_pct: 0.01
decommissioning_pct: 0.15
commissioning_cost_kW: 44.0
decommissioning_cost_kW: 58.0
distance_to_substation: 1.0
distance_to_interconnection: 8.5
interconnect_voltage: 130.
distance_to_site: 115.
distance_to_landfall: 50.
port_cost_per_month: 2e6
site_auction_price: 100e6
site_assessment_plan_cost: 1e6
site_assessment_cost: 25e6
construction_operations_plan_cost: 2.5e6
boem_review_cost: 0.0
design_install_plan_cost: 2.5e6
construction_insurance: 44.0
construction_financing: 183.0
contingency: 316.0
site_auction_price: 100e6
site_assessment_cost: 50e6
construction_plan_cost: 2.5e5
installation_plan_cost: 1e6

costs:
wake_loss_factor: 0.15
Expand Down
21 changes: 16 additions & 5 deletions examples/03_NREL5MW_OC3_spar/nrel5mw-spar_oc3.yaml
Original file line number Diff line number Diff line change
Expand Up @@ -818,11 +818,22 @@ environment:
bos:
plant_turbine_spacing: 7
plant_row_spacing: 7
commissioning_pct: 0.01
decommissioning_pct: 0.15
distance_to_substation: 50.0
distance_to_interconnection: 8.
interconnect_voltage: 130
commissioning_cost_kW: 44.0
decommissioning_cost_kW: 58.0
distance_to_substation: 1.0
distance_to_interconnection: 8.5
interconnect_voltage: 130.
distance_to_site: 115.
distance_to_landfall: 50.
port_cost_per_month: 2e6
boem_review_cost: 0.0
construction_insurance: 44.0
construction_financing: 183.0
contingency: 316.0
site_auction_price: 100e6
site_assessment_cost: 50e6
construction_plan_cost: 2.5e5
installation_plan_cost: 1e6

costs:
wake_loss_factor: 0.15
Expand Down
23 changes: 17 additions & 6 deletions examples/04_NREL5MW_OC4_semi/nrel5mw-semi_oc4.yaml
Original file line number Diff line number Diff line change
Expand Up @@ -991,12 +991,23 @@ environment:
bos:
plant_turbine_spacing: 7
plant_row_spacing: 7
commissioning_pct: 0.01
decommissioning_pct: 0.15
distance_to_substation: 50.0
distance_to_interconnection: 8.
interconnect_voltage: 130

commissioning_cost_kW: 44.0
decommissioning_cost_kW: 58.0
distance_to_substation: 1.0
distance_to_interconnection: 8.5
interconnect_voltage: 130.
distance_to_site: 115.
distance_to_landfall: 50.
port_cost_per_month: 2e6
boem_review_cost: 0.0
construction_insurance: 44.0
construction_financing: 183.0
contingency: 316.0
site_auction_price: 100e6
site_assessment_cost: 50e6
construction_plan_cost: 2.5e5
installation_plan_cost: 1e6

costs:
wake_loss_factor: 0.15
fixed_charge_rate: 0.075
Expand Down
4 changes: 2 additions & 2 deletions examples/05_IEA-3.4-130-RWT/IEA-3p4-130-RWT.yaml
Original file line number Diff line number Diff line change
Expand Up @@ -686,8 +686,8 @@ environment:
bos:
plant_turbine_spacing: 7
plant_row_spacing: 7
commissioning_pct: 0.01
decommissioning_pct: 0.15
commissioning_cost_kW: 44.0
decommissioning_cost_kW: 58.0
distance_to_substation: 50.0
distance_to_interconnection: 8.
interconnect_voltage: 130
Expand Down
16 changes: 9 additions & 7 deletions examples/06_IEA-15-240-RWT/IEA-15-240-RWT_Monopile.yaml
Original file line number Diff line number Diff line change
Expand Up @@ -1014,20 +1014,22 @@ environment:
bos:
plant_turbine_spacing: 7
plant_row_spacing: 7
commissioning_pct: 0.01
decommissioning_pct: 0.15
commissioning_cost_kW: 44.0
decommissioning_cost_kW: 58.0
distance_to_substation: 1.0
distance_to_interconnection: 8.5
interconnect_voltage: 130.
distance_to_site: 115.
distance_to_landfall: 50.
port_cost_per_month: 2e6
site_auction_price: 100e6
site_assessment_plan_cost: 1e6
site_assessment_cost: 25e6
construction_operations_plan_cost: 2.5e6
boem_review_cost: 0.0
design_install_plan_cost: 2.5e6
construction_insurance: 44.0
construction_financing: 183.0
contingency: 316.0
site_auction_price: 100e6
site_assessment_cost: 50e6
construction_plan_cost: 2.5e5
installation_plan_cost: 1e6
costs:
wake_loss_factor: 0.15
fixed_charge_rate: 0.056
Expand Down
16 changes: 9 additions & 7 deletions examples/06_IEA-15-240-RWT/IEA-15-240-RWT_VolturnUS-S.yaml
Original file line number Diff line number Diff line change
Expand Up @@ -1278,20 +1278,22 @@ environment:
bos:
plant_turbine_spacing: 7
plant_row_spacing: 7
commissioning_pct: 0.01
decommissioning_pct: 0.15
commissioning_cost_kW: 44.0
decommissioning_cost_kW: 58.0
distance_to_substation: 1.0
distance_to_interconnection: 8.5
interconnect_voltage: 130.
distance_to_site: 115.
distance_to_landfall: 50.
port_cost_per_month: 2e6
site_auction_price: 100e6
site_assessment_plan_cost: 1e6
site_assessment_cost: 25e6
construction_operations_plan_cost: 2.5e6
boem_review_cost: 0.0
design_install_plan_cost: 2.5e6
construction_insurance: 44.0
construction_financing: 183.0
contingency: 316.0
site_auction_price: 100e6
site_assessment_cost: 50e6
construction_plan_cost: 2.5e5
installation_plan_cost: 1e6
costs:
wake_loss_factor: 0.15
fixed_charge_rate: 0.056
Expand Down
16 changes: 9 additions & 7 deletions examples/06_IEA-15-240-RWT/IEA-15-floating_wTMDs.yaml
Original file line number Diff line number Diff line change
Expand Up @@ -1278,20 +1278,22 @@ environment:
bos:
plant_turbine_spacing: 7
plant_row_spacing: 7
commissioning_pct: 0.01
decommissioning_pct: 0.15
commissioning_cost_kW: 44.0
decommissioning_cost_kW: 58.0
distance_to_substation: 1.0
distance_to_interconnection: 8.5
interconnect_voltage: 130.
distance_to_site: 115.
distance_to_landfall: 50.
port_cost_per_month: 2e6
site_auction_price: 100e6
site_assessment_plan_cost: 1e6
site_assessment_cost: 25e6
construction_operations_plan_cost: 2.5e6
boem_review_cost: 0.0
design_install_plan_cost: 2.5e6
construction_insurance: 44.0
construction_financing: 183.0
contingency: 316.0
site_auction_price: 100e6
site_assessment_cost: 50e6
construction_plan_cost: 2.5e5
installation_plan_cost: 1e6
costs:
wake_loss_factor: 0.15
fixed_charge_rate: 0.056
Expand Down
16 changes: 9 additions & 7 deletions examples/06_IEA-15-240-RWT/IEA-15-floating_wTMDs_tower.yaml
Original file line number Diff line number Diff line change
Expand Up @@ -1216,20 +1216,22 @@ environment:
bos:
plant_turbine_spacing: 7
plant_row_spacing: 7
commissioning_pct: 0.01
decommissioning_pct: 0.15
commissioning_cost_kW: 44.0
decommissioning_cost_kW: 58.0
distance_to_substation: 1.0
distance_to_interconnection: 8.5
interconnect_voltage: 130.
distance_to_site: 115.
distance_to_landfall: 50.
port_cost_per_month: 2e6
site_auction_price: 100e6
site_assessment_plan_cost: 1e6
site_assessment_cost: 25e6
construction_operations_plan_cost: 2.5e6
boem_review_cost: 0.0
design_install_plan_cost: 2.5e6
construction_insurance: 44.0
construction_financing: 183.0
contingency: 316.0
site_auction_price: 100e6
site_assessment_cost: 50e6
construction_plan_cost: 2.5e5
installation_plan_cost: 1e6

costs:
wake_loss_factor: 0.15
Expand Down
9 changes: 8 additions & 1 deletion examples/07_te_flaps/BAR_USC_flaps.yaml
Original file line number Diff line number Diff line change
Expand Up @@ -913,5 +913,12 @@ control:
setpoint_smooth: {ss_vsgain: 1, ss_pcgain: 0.001}
shutdown: {limit_type: gen_speed, limit_value: 2.0}
environment: {air_density: 1.225, air_dyn_viscosity: 1.81e-05, weib_shape_parameter: 2.0, air_speed_sound: 340.0, shear_exp: 0.2, water_density: 1025.0, water_dyn_viscosity: 0.0013351, soil_shear_modulus: 140000000.0, soil_poisson: 0.4, gravity: 9.80665, air_pressure: 103500.0, air_vapor_pressure: 1700.0, water_depth: 0.0, V_mean: 0.0}
bos: {plant_turbine_spacing: 7, plant_row_spacing: 7, commissioning_pct: 0.01, decommissioning_pct: 0.15, distance_to_substation: 50.0, distance_to_interconnection: 8.0, interconnect_voltage: 130, distance_to_landfall: 100, distance_to_site: 100, port_cost_per_month: 2000000.0, site_auction_price: 0.0, site_assessment_plan_cost: 0.0, site_assessment_cost: 0.0, construction_operations_plan_cost: 0.0, boem_review_cost: 0.0, design_install_plan_cost: 0.0}
bos:
plant_turbine_spacing: 7
plant_row_spacing: 7
commissioning_cost_kW: 44.0
decommissioning_cost_kW: 58.0
distance_to_substation: 50.0
distance_to_interconnection: 8.
interconnect_voltage: 130
costs: {wake_loss_factor: 0.15, fixed_charge_rate: 0.0578, bos_per_kW: 441.0, opex_per_kW: 43.0, turbine_number: 120, labor_rate: 58.8, painting_rate: 30.0, blade_mass_cost_coeff: 14.6, hub_mass_cost_coeff: 3.9, pitch_system_mass_cost_coeff: 22.1, spinner_mass_cost_coeff: 11.1, lss_mass_cost_coeff: 11.9, bearing_mass_cost_coeff: 4.5, gearbox_mass_cost_coeff: 12.9, hss_mass_cost_coeff: 6.8, generator_mass_cost_coeff: 12.4, bedplate_mass_cost_coeff: 2.9, yaw_mass_cost_coeff: 8.3, converter_mass_cost_coeff: 18.8, transformer_mass_cost_coeff: 18.8, hvac_mass_cost_coeff: 124.0, cover_mass_cost_coeff: 5.7, elec_connec_machine_rating_cost_coeff: 41.85, platforms_mass_cost_coeff: 17.1, tower_mass_cost_coeff: 2.9, controls_machine_rating_cost_coeff: 21.15, crane_cost: 12000.0}
9 changes: 8 additions & 1 deletion examples/08_OLAF/BAR_USC.yaml
Original file line number Diff line number Diff line change
Expand Up @@ -898,5 +898,12 @@ control:
setpoint_smooth: {ss_vsgain: 1, ss_pcgain: 0.001}
shutdown: {limit_type: gen_speed, limit_value: 2.0}
environment: {air_density: 1.225, air_dyn_viscosity: 1.81e-05, weib_shape_parameter: 2.0, air_speed_sound: 340.0, shear_exp: 0.2, water_density: 1025.0, water_dyn_viscosity: 0.0013351, soil_shear_modulus: 140000000.0, soil_poisson: 0.4, gravity: 9.80665, air_pressure: 103500.0, air_vapor_pressure: 1700.0, water_depth: 0.0, V_mean: 0.0}
bos: {plant_turbine_spacing: 7, plant_row_spacing: 7, commissioning_pct: 0.01, decommissioning_pct: 0.15, distance_to_substation: 50.0, distance_to_interconnection: 8.0, interconnect_voltage: 130, distance_to_landfall: 100, distance_to_site: 100, port_cost_per_month: 2000000.0, site_auction_price: 0.0, site_assessment_plan_cost: 0.0, site_assessment_cost: 0.0, construction_operations_plan_cost: 0.0, boem_review_cost: 0.0, design_install_plan_cost: 0.0}
bos:
plant_turbine_spacing: 7
plant_row_spacing: 7
commissioning_cost_kW: 44.0
decommissioning_cost_kW: 58.0
distance_to_substation: 50.0
distance_to_interconnection: 8.
interconnect_voltage: 130
costs: {wake_loss_factor: 0.15, fixed_charge_rate: 0.0578, bos_per_kW: 441.0, opex_per_kW: 43.0, turbine_number: 120, labor_rate: 58.8, painting_rate: 30.0, blade_mass_cost_coeff: 14.6, hub_mass_cost_coeff: 3.9, pitch_system_mass_cost_coeff: 22.1, spinner_mass_cost_coeff: 11.1, lss_mass_cost_coeff: 11.9, bearing_mass_cost_coeff: 4.5, gearbox_torque_cost: 50., hss_mass_cost_coeff: 6.8, generator_mass_cost_coeff: 12.4, bedplate_mass_cost_coeff: 2.9, yaw_mass_cost_coeff: 8.3, converter_mass_cost_coeff: 18.8, transformer_mass_cost_coeff: 18.8, hvac_mass_cost_coeff: 124.0, cover_mass_cost_coeff: 5.7, elec_connec_machine_rating_cost_coeff: 41.85, platforms_mass_cost_coeff: 17.1, tower_mass_cost_coeff: 2.9, controls_machine_rating_cost_coeff: 21.15, crane_cost: 12000.0}
16 changes: 9 additions & 7 deletions examples/12_linearization/IEA-15-floating.yaml
Original file line number Diff line number Diff line change
Expand Up @@ -1175,20 +1175,22 @@ environment:
bos:
plant_turbine_spacing: 7
plant_row_spacing: 7
commissioning_pct: 0.01
decommissioning_pct: 0.15
commissioning_cost_kW: 44.0
decommissioning_cost_kW: 58.0
distance_to_substation: 1.0
distance_to_interconnection: 8.5
interconnect_voltage: 130.
distance_to_site: 115.
distance_to_landfall: 50.
port_cost_per_month: 2e6
site_auction_price: 100e6
site_assessment_plan_cost: 1e6
site_assessment_cost: 25e6
construction_operations_plan_cost: 2.5e6
boem_review_cost: 0.0
design_install_plan_cost: 2.5e6
construction_insurance: 44.0
construction_financing: 183.0
contingency: 316.0
site_auction_price: 100e6
site_assessment_cost: 50e6
construction_plan_cost: 2.5e5
installation_plan_cost: 1e6

costs:
wake_loss_factor: 0.15
Expand Down
16 changes: 9 additions & 7 deletions examples/14_level2ccd/IEA-15-floating.yaml
Original file line number Diff line number Diff line change
Expand Up @@ -1175,20 +1175,22 @@ environment:
bos:
plant_turbine_spacing: 7
plant_row_spacing: 7
commissioning_pct: 0.01
decommissioning_pct: 0.15
commissioning_cost_kW: 44.0
decommissioning_cost_kW: 58.0
distance_to_substation: 1.0
distance_to_interconnection: 8.5
interconnect_voltage: 130.
distance_to_site: 115.
distance_to_landfall: 50.
port_cost_per_month: 2e6
site_auction_price: 100e6
site_assessment_plan_cost: 1e6
site_assessment_cost: 25e6
construction_operations_plan_cost: 2.5e6
boem_review_cost: 0.0
design_install_plan_cost: 2.5e6
construction_insurance: 44.0
construction_financing: 183.0
contingency: 316.0
site_auction_price: 100e6
site_assessment_cost: 50e6
construction_plan_cost: 2.5e5
installation_plan_cost: 1e6

costs:
wake_loss_factor: 0.15
Expand Down
Original file line number Diff line number Diff line change
Expand Up @@ -1291,20 +1291,22 @@ environment:
bos:
plant_turbine_spacing: 7
plant_row_spacing: 7
commissioning_pct: 0.01
decommissioning_pct: 0.15
commissioning_cost_kW: 44.0
decommissioning_cost_kW: 58.0
distance_to_substation: 1.0
distance_to_interconnection: 8.5
interconnect_voltage: 130.
distance_to_site: 115.
distance_to_landfall: 50.
port_cost_per_month: 2e6
site_auction_price: 100e6
site_assessment_plan_cost: 1e6
site_assessment_cost: 25e6
construction_operations_plan_cost: 2.5e6
boem_review_cost: 0.0
design_install_plan_cost: 2.5e6
construction_insurance: 44.0
construction_financing: 183.0
contingency: 316.0
site_auction_price: 100e6
site_assessment_cost: 50e6
construction_plan_cost: 2.5e5
installation_plan_cost: 1e6
costs:
wake_loss_factor: 0.15
fixed_charge_rate: 0.056
Expand Down
20 changes: 19 additions & 1 deletion examples/17_IEA22_Optimization/IEA-22-280-RWT-Semi.yaml
Original file line number Diff line number Diff line change
Expand Up @@ -1073,5 +1073,23 @@ control:
setpoint_smooth: {ss_vsgain: 1, ss_pcgain: 0.001}
shutdown: {limit_type: gen_speed, limit_value: 2.0}
environment: {air_density: 1.225, air_dyn_viscosity: 1.81e-05, weib_shape_parameter: 2.0, air_speed_sound: 340.0, shear_exp: 0.12, water_density: 1025.0, water_dyn_viscosity: 0.0013351, soil_shear_modulus: 140000000.0, soil_poisson: 0.4, water_depth: 200.0, significant_wave_height: 4.52, significant_wave_period: 9.45, gravity: 9.80665, air_pressure: 103500.0, air_vapor_pressure: 1700.0, V_mean: 0.0}
bos: {plant_turbine_spacing: 7, plant_row_spacing: 7, commissioning_pct: 0.01, decommissioning_pct: 0.15, distance_to_substation: 1.0, distance_to_interconnection: 8.5, interconnect_voltage: 130.0, distance_to_site: 115.0, distance_to_landfall: 50.0, port_cost_per_month: 2000000.0, site_auction_price: 100000000.0, site_assessment_plan_cost: 1000000.0, site_assessment_cost: 25000000.0, construction_operations_plan_cost: 2500000.0, boem_review_cost: 0.0, design_install_plan_cost: 2500000.0}
bos:
plant_turbine_spacing: 7
plant_row_spacing: 7
commissioning_cost_kW: 44.0
decommissioning_cost_kW: 58.0
distance_to_substation: 1.0
distance_to_interconnection: 8.5
interconnect_voltage: 130.
distance_to_site: 115.
distance_to_landfall: 50.
port_cost_per_month: 2e6
boem_review_cost: 0.0
construction_insurance: 44.0
construction_financing: 183.0
contingency: 316.0
site_auction_price: 100e6
site_assessment_cost: 50e6
construction_plan_cost: 2.5e5
installation_plan_cost: 1e6
costs: {wake_loss_factor: 0.15, fixed_charge_rate: 0.058, bos_per_kW: 4050, opex_per_kW: 118.0, turbine_number: 27.0, labor_rate: 58.8, painting_rate: 30.0, blade_mass_cost_coeff: 13.291168594347853, hub_mass_cost_coeff: 3.9, pitch_system_mass_cost_coeff: 22.1, spinner_mass_cost_coeff: 11.1, lss_mass_cost_coeff: 11.9, bearing_mass_cost_coeff: 4.5, gearbox_mass_cost_coeff: 12.9, hss_mass_cost_coeff: 6.8, generator_mass_cost_coeff: 23.247612965626796, bedplate_mass_cost_coeff: 2.9, yaw_mass_cost_coeff: 8.3, converter_mass_cost_coeff: 18.8, transformer_mass_cost_coeff: 18.8, hvac_mass_cost_coeff: 362.3333772011725, cover_mass_cost_coeff: 16.60090142324545, elec_connec_machine_rating_cost_coeff: 41.85, platforms_mass_cost_coeff: 17.1, tower_mass_cost_coeff: 2.7071858084019347, controls_machine_rating_cost_coeff: 21.15, crane_cost: 12000.0, electricity_price: 0.04, reserve_margin_price: 120.0, capacity_credit: 0.0, benchmark_price: 0.071}