Preparation for Release 29 #173
review-checks.yml
on: pull_request
check-pylint
3m 48s
check-docs
1m 4s
Matrix: integration-tests
Annotations
2 errors and 1 warning
integration-tests (bkr.inttest.labcontroller)
Process completed with exit code 1.
|
integration-tests (bkr.inttest.server)
The run was canceled by @StykMartin.
|
integration-tests (bkr.inttest.server)
Runner GitHub Actions 6 did not respond to a cancelation request with 00:05:00.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
beaker-docs
Expired
|
8.07 MB |
|