Skip to content

feat: add woodpecker-cli lint hook #1520

feat: add woodpecker-cli lint hook

feat: add woodpecker-cli lint hook #1520

Re-run triggered September 15, 2025 16:05
Status Cancelled
Total duration 6m 3s
Artifacts

ci.yaml

on: pull_request
Matrix: tests-flakes-stable
Matrix: tests-flakes
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

6 errors
tests-flakes (ubuntu-latest)
Process completed with exit code 1.
tests-flakes (macos-latest)
The strategy configuration was canceled because "tests-flakes.ubuntu-latest" failed
tests-flakes-stable (ubuntu-latest)
Process completed with exit code 1.
tests-flakes-stable (macos-latest)
The strategy configuration was canceled because "tests-flakes-stable.ubuntu-latest" failed
tests (macos-latest)
Canceling since a higher priority waiting request for Build-refs/pull/589/merge exists
Build
Canceling since a higher priority waiting request for Build-refs/pull/589/merge exists