Skip to content

chore(pre-commit): update ruff to v0.14.6 #304

chore(pre-commit): update ruff to v0.14.6

chore(pre-commit): update ruff to v0.14.6 #304

Triggered via pull request September 10, 2025 16:51
Status Failure
Total duration 31s
Artifacts

test.yml

on: pull_request
pre-commit
27s
pre-commit
Matrix: Nox
Fit to window
Zoom out
Zoom in

Annotations

16 errors
Nox (3.7)
The version '3.7' with architecture 'x64' was not found for Ubuntu 24.04. The list of all available versions can be found here: https://raw.githubusercontent.com/actions/python-versions/main/versions-manifest.json
Nox (3.9)
The operation was canceled.
Nox (3.9)
The strategy configuration was canceled because "nox._3_7" failed
Nox (3.8)
The operation was canceled.
Nox (3.8)
The strategy configuration was canceled because "nox._3_7" failed
Nox (3.11)
The operation was canceled.
Nox (3.11)
The strategy configuration was canceled because "nox._3_7" failed
Nox (3.13.0-alpha - 3.13)
The operation was canceled.
Nox (3.13.0-alpha - 3.13)
The strategy configuration was canceled because "nox._3_7" failed
Nox (3.12)
The operation was canceled.
Nox (3.12)
The strategy configuration was canceled because "nox._3_7" failed
Nox (3.10)
The operation was canceled.
Nox (3.10)
The strategy configuration was canceled because "nox._3_7" failed
Nox (pypy-3.10)
The operation was canceled.
Nox (pypy-3.10)
The strategy configuration was canceled because "nox._3_7" failed
pre-commit
Process completed with exit code 1.