Skip to content

Milestones

List view

  • No due date
    2/2 issues closed
  • No due date
    1/1 issues closed
  • No due date
    1/1 issues closed
  • All core packages should be running, mxcube3 will be used at Biomax for commissioning the diffractometer (not all the features will be used but the ones related to the udiff)

    Due by January 30, 2016
    19/19 issues closed
  • By this date we should be able to do an experiment at BioMAX Single wavelength data collection of a single protein crystal ∗ able to centre the crystal ∗ able to optimise beam on sample ∗ able to collect a series of images (through a queue) ∗ drive the detector to a proper distance ∗ know the wavelength ∗ as a wish, mount the crystal with the sample changer

    Due by June 20, 2016
    3/3 issues closed