Skip to content

Use SPNEGO mechanism by default #76

Use SPNEGO mechanism by default

Use SPNEGO mechanism by default #76

Re-run triggered September 8, 2025 14:38
Status Failure
Total duration 2m 4s
Artifacts

ci.yml

on: pull_request
Matrix: Test
Create Release
0s
Create Release
Fit to window
Zoom out
Zoom in

Annotations

9 errors
Test (3.10)
Process completed with exit code 1.
Test (3.12)
The operation was canceled.
Test (3.12)
The strategy configuration was canceled because "test._3_10" failed
Test (3.9)
The operation was canceled.
Test (3.9)
The strategy configuration was canceled because "test._3_10" failed
Test (3.13)
The operation was canceled.
Test (3.13)
The strategy configuration was canceled because "test._3_10" failed
Test (3.11)
The operation was canceled.
Test (3.11)
The strategy configuration was canceled because "test._3_10" failed