Skip to content

build(deps): bump project dependencies, migrate to vitest #486

build(deps): bump project dependencies, migrate to vitest

build(deps): bump project dependencies, migrate to vitest #486

Triggered via pull request August 2, 2025 18:38
@rfprodrfprod
synchronize #894
eslint-config
Status Failure
Total duration 9m 14s
Artifacts

validate-pr.yml

on: pull_request
Matrix: build-affected-storybook
Matrix: build-affected
Matrix: lint-affected
Matrix: test-affected
premerge
2s
premerge
Fit to window
Zoom out
Zoom in

Annotations

21 errors
test-affected (api,client-core-components-e2e,client-diagnostics-e2e,client-e2e,client,documentat...: libs/backend-grpc/src/lib/controller/grpc.controller.ts#L37
A type referenced in a decorated signature must be imported with 'import type' or a namespace import when 'isolatedModules' and 'emitDecoratorMetadata' are enabled.
test-affected (api,client-core-components-e2e,client-diagnostics-e2e,client-e2e,client,documentat...: libs/client-dashboards/src/lib/components/table/table.component.ts#L21
A type referenced in a decorated signature must be imported with 'import type' or a namespace import when 'isolatedModules' and 'emitDecoratorMetadata' are enabled.
test-affected (api,client-core-components-e2e,client-diagnostics-e2e,client-e2e,client,documentat...: libs/client-dashboards/src/lib/components/table/table.component.ts#L21
This member must have an 'override' modifier because it overrides a member in the base class 'AppTableBase<T>'.
test-affected (client-store-http-progress,client-store-diagnostics,client-store-http-api,client-s...
The strategy configuration was canceled because "test-affected.api_client-core-component" failed
test-affected (client-pwa-offline,client-service-worker,client-testing-e2e,client-translate,clien...
The strategy configuration was canceled because "test-affected.api_client-core-component" failed
test-affected (backend-auth,backend-diagnostics,backend-gql,backend-grpc,backend-interfaces,backe...
The strategy configuration was canceled because "test-affected.api_client-core-component" failed
test-affected (proto,tools,workspace-plugin)
The operation was canceled.
test-affected (proto,tools,workspace-plugin)
The strategy configuration was canceled because "test-affected.api_client-core-component" failed
test-affected (client-d3-charts,client-diagnostics,client-dashboards,client-directives,client-gql...
The strategy configuration was canceled because "test-affected.api_client-core-component" failed
build-affected (api,client,documentation)
Process completed with exit code 1.
build-affected (client-util-eliza,workspace-plugin)
The operation was canceled.
build-affected (client-util-eliza,workspace-plugin)
The strategy configuration was canceled because "build-affected.api_client_documentation" failed
build-affected (elements,server-prod,backend-diagnostics)
The operation was canceled.
build-affected (elements,server-prod,backend-diagnostics)
The strategy configuration was canceled because "build-affected.api_client_documentation" failed
test
Process completed with exit code 1.
premerge
Process completed with exit code 1.