Skip to content

master

master #320

Triggered via schedule March 16, 2025 01:50
Status Failure
Total duration 1m 28s
Artifacts

master.yaml

on: schedule
Matrix: Test
Fit to window
Zoom out
Zoom in

Annotations

3 errors
Test (1.60.0)
Process completed with exit code 101.
Test (stable)
The operation was canceled.
Test (stable)
The strategy configuration was canceled because "test._1_60_0" failed