Skip to content

Pull requests: shipwright-io/build

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Sort

Pull requests list

Add automation to trigger automatic updates of the BuildKit image in our sample build strategies kind/feature Categorizes issue or PR as related to a new feature. release-note-none Label for when a PR does not need a release note size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
#1733 opened Nov 16, 2024 by SaschaSchwarze0 Loading…
2 of 4 tasks
release-v0.15.0
Remove openshift-ci directory kind/cleanup Categorizes issue or PR as related to cleaning up code, process, or technical debt. release-note-none Label for when a PR does not need a release note size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#1730 opened Nov 11, 2024 by SaschaSchwarze0 Loading…
2 of 4 tasks
release-v0.15.0
WIP Add Tolerations to Build and BuildRun objects do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. release-note Label for when a PR has specified a release note size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#1711 opened Oct 30, 2024 by dorzel Draft
4 tasks
fix: update the storage-version-migration script to complete execution in finite time release-note-none Label for when a PR does not need a release note size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#1682 opened Sep 16, 2024 by ayushsatyam146 Loading…
2 of 4 tasks
ProTip! Add no:assignee to see everything that’s not assigned.