Skip to content

Upgrade to latest memray #70

Upgrade to latest memray

Upgrade to latest memray #70

Triggered via push February 20, 2025 09:45
Status Failure
Total duration 1m 26s
Artifacts

ci.yml

on: push
test_experimental
28s
test_experimental
Matrix: test_compat
Fit to window
Zoom out
Zoom in

Annotations

9 errors
test_compat (3.11, py311-upper_bound_deps)
Process completed with exit code 1.
test_compat (3.13, py313-upper_bound_deps)
The job was canceled because "_3_11_py311-upper_bound_d" failed.
test_compat (3.13, py313-upper_bound_deps)
The operation was canceled.
test_compat (3.12, py312-upper_bound_deps)
The job was canceled because "_3_11_py311-upper_bound_d" failed.
test_compat (3.12, py312-upper_bound_deps)
The operation was canceled.
test_compat (3.10, py310-upper_bound_deps)
The job was canceled because "_3_11_py311-upper_bound_d" failed.
test_compat (3.10, py310-upper_bound_deps)
The operation was canceled.
test_compat (3.9, py39-lower_bound_deps)
The job was canceled because "_3_11_py311-upper_bound_d" failed.
test_compat (3.9, py39-lower_bound_deps)
The operation was canceled.