Skip to content

Switch to fftfreq #1093

Switch to fftfreq

Switch to fftfreq #1093

Triggered via push October 11, 2024 14:44
Status Failure
Total duration 3m 3s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

ci.yml

on: push
Matrix: tests
coverage
0s
coverage
Fit to window
Zoom out
Zoom in

Annotations

9 errors
pre-commit
Process completed with exit code 1.
docs
Process completed with exit code 2.
tests (3.9)
Process completed with exit code 2.
tests (3.12)
The job was canceled because "_3_9" failed.
tests (3.12)
Process completed with exit code 2.
tests (3.10)
The job was canceled because "_3_9" failed.
tests (3.10)
Process completed with exit code 2.
tests (3.11)
The job was canceled because "_3_9" failed.
tests (3.11)
The operation was canceled.